TSX: DPM C$ Gold: US$/oz.

Work Management

Operational Benefits of Innovation

Central Control Room – integrated infrastructure

A single point of access into a wide variety of systems:
  • Remote control (ventilation, pumping) – improved re-entry time
  • Remote blasting
  • Real-time monitoring location of people and equipment
  • Real time task monitoring and reporting (between surface and underground)
  • Closing the loop: root cause analysis, analyze and improve based on real time data
  • Schedule, assign, monitor tasks allocated equipment and crew to be completed
  • Improve access to information
    Enabling remote management of business processes
    • Decision making, at the appropriate level, based on information
    • Use of data analytics and integrity
    • Exception management
    Know of and solve problems before they occur
    Delays identified and corrected at an early stage
    • Increased Safety Factor
    • Predictable production
  • Improve efficiency
    Productive utilization of resources, being personnel, equipment, workplaces
    • Effective Shift management
    • Mine service activities – better utilization of resources

 

Stock Quote: TSE

Price 2.43

Change -0.01

Volume 122,802

% Change -0.41%

Intraday High 2.49

52 Week High 4.14

Intraday Low 2.41

52 Week Low 1.87

Today's Open 2.47

Previous Close 2.44

05/26/2017 03:59 PM ET Pricing delayed 20 minutes
: 1,267.80 ?+11.29

Navigation

Back to top